PSE was recently working on NE 180th St between 10th Ave NE and 15th Ave NE in Shoreline. Their asphalt patching is absolutely horrible and has left potholes and speed-bump sized lumps in the road. Drivers are routinely driving out of their lanes and slowing/stopping in the road in an effort to avoid the bumps. This is creating an unsafe situation for cars and pedestrians.
también preguntó...
Q. What size is the pothole?
A. large
A. large
2 Comentars
Cerrado City of Shoreline (Oficial verificado)
The Right-of-Way inspectors stated that the job is not complete. PSE contractors will be back to complete the half street overlay in the next week.