Repave this section of Road 已存档

36 13th St Ne Atlanta, GA 在地图上显示 隐藏地图
Move the marker to represent your issue's location. The address will not change.

报告人

(客人)

问题 ID:

123788

Submitted To:

Midtown Alliance

类别:

Other

已查看:

2470 次数

社区:

Atlanta

已报告:


说明

The entire length of road on 13th Street between Spring Street and West Peachtree Street needs to be repaved. The road is very uneven with discarded and hardened concrete piles making the road very rough. Also need new signage on this road indicating that it is a ONE WAY street. currently in the middle of the road in front of the parking lot, there is no signage and people are always going the wrong way.


7 评论s

存档问题的评论被关闭。