Description
The right hand lane has a very serious road heave. I was almost thrown off of the roadway when I hit this with my work truck. This needs to be milled and repaved at the very least. NJDOT could do it in 2 days; PennDOT wil take 2 years.
The right hand lane has a very serious road heave. I was almost thrown off of the roadway when I hit this with my work truck. This needs to be milled and repaved at the very least. NJDOT could do it in 2 days; PennDOT wil take 2 years.
1 Comment
Closed boomer1ny (Registered User)