说明
The southbound sidewalk on Piedmont Ave north of MacArthur is blocked by construction fencing and utilities Pedestrians are forced into the traffic lane Even the disabled
还问了...
问 How long has the construction material been there?
答 weeks
答 weeks
问 How much of the sidewalk is obstructed?
答 90%
答 90%
问 Is the material covered?
答 Don't Know / No Answer
答 Don't Know / No Answer
问 Is the material located near a storm drain inlet?
答 Don't Know / No Answer
答 Don't Know / No Answer
问 Can you identify the company doing the construction work?
答 not sure
答 not sure
1 评论
已确认 City of Oakland (官方验证)