الوصف
Since 1998, we have been trying to get our street repaved. The street and sidewalks are in horrendous shape. Water lays on it all the way down the street. Pavement is all sunk. Sidewalks are all shifted, and hard to walk on. Have reported this many, many times, with no results.
7 تعليقs
City of Grande Prairie (مستخدم مسجل)
Rj (ضيف)
Display Name Blocked (98872) (مستخدم مسجل)
مغلق Display Name Blocked (23184) (مستخدم مسجل)
Construction is tentatively scheduled for 2015 subject to approval in the capital budget fro 2015- 2019.
فتح Ken Sallis (مستخدم مسجل)
تم إقراره Engineering Staff (مستخدم مسجل)
مغلق Engineering Services Staff (مستخدم مسجل)