Deb
-
Traffic Light/Signal Archived2025 W Spring St Monroe, Georgia - Monroetraffic signal at Hwy 138 and Michael Etchison causes a bottleneck. The lanes need to be changed where the right lane on Michael Etchison should be a right turn only and the left lane made a straight and left turn.