Description
Sidewalk had separated and was previously repaired by the city. It continues to be a very bad tripping hazard. I request that the city repair the problem correctly by removing the concrete and tree roots to make a smooth sidewalk.
Sidewalk had separated and was previously repaired by the city. It continues to be a very bad tripping hazard. I request that the city repair the problem correctly by removing the concrete and tree roots to make a smooth sidewalk.
1 Comment
Closed RVA Care Warrior (Registered User)
9/16/2013 - Richmond Sidewalk Mgmt Team (20020862689) finished out inspection for this location and noted as of 3/1/2013 that 1-4ft X 35ft section of sidewalk will need repair and that the black asphalt temporary patch to increase safety is in place until the permanent repair is executed. The tentative schedule for permanent repair completion is before September 2018. Please understand that SeeClickFix is setup for quick fixes in the City of Richmond that can take place more immediately once entered onto SeeClickFix. Sidewalk maintenance most times will take more than one year or two years for maintenance to take place once the safety inspection is executed. This is due to the size of the crew and the volume of tickets that must be prioritized and worked. Please call the Richmond Customer Care Center at 646-7000 with the request number so that updates and follow through can take place
We appreciate your communication that helps us in “Building The Best Richmond” together – rtt