Description
The short piece of pavement from 9P onto the N'way ramp is extremely uneven. When the ramp was repaved, this piece was never done. Concrete underlay needs to be leveled and the piece repaved.
Reporter
The short piece of pavement from 9P onto the N'way ramp is extremely uneven. When the ramp was repaved, this piece was never done. Concrete underlay needs to be leveled and the piece repaved.
2 Comments
billandpeg2 (Registered User)
Closed billandpeg2 (Registered User)