The watermain and sewer were replaced along 32nd St. East of Alder was repaired two weeks ago. West of Alder has been left alone, no construction for a week now with concrete from the torn up street piled up and construction equipment parked. project was supposed to be completed on the 14th. this road needs to be resurfaced and reopened ASAP before the holiday on the fourth due to expected very heavy traffic. My driveway approach at 3212 has been damaged in the construction as well.