Description
I wrote in last year about a gas smell and Enbridge work that took forever and then once complete they left my lawn and sidewalk with a hole covered by a board with a pylon on top.
After you posted my story the grass was sodded but the sidewalk was done with asphalt and not concrete to match the original. The work was done half-assed and the city workers should replace the whole sidewalk section and not have done cheap patch job.
Still frustrated
Link to original posting:
http://www.thestar.com/yourtoronto/the_fixer/2012/09/05/the_fixer_gas_leak_is_finally_fixed_but_not_the_holes_dug_to_get_at_it.html
2 Comments
Derek (Guest)
http://www.thestar.com/yourtoronto/the_fixer/2012/09/05/the_fixer_gas_leak_is_finally_fixed_but_not_the_holes_dug_to_get_at_it.html
Link to my original posting last September.
BigPete (Registered User)