Description

Utility cut on Bellevue at Casino Terrace intersection repaired with asphalt -- Not in accordance with City of Newport Ordinance 12.08.070
J.
Any individual, corporation, public utility or activity that performs work in, upon, or effecting the roadway of Bellevue Avenue shall be required, as a condition of the issuance of a permit to cut the roadway, to repair and replace the roadway only in full slab units. All costs relative to the repair and replacement of slabs is to be borne by the individual, corporation, public utility or activity requesting the slab for which the director of public services shall require a completion bond for all such work. Contractors performing the work shall be approved by the director of public services. The slabs shall be of the same color, texture, thickness, etc. All concrete roadway slab replacements shall be the same as the standards of the department of public services engineering division and/or the Rhode Island Department of Transportation's Standard Specifications for Road and Bridge Construction, 2004, as amended and shall further be the same as the specifications of the Bellevue Avenue Reconstruction Contract, identified as Rhode Island Federal Aid Project No. CRP-FY89 (003)


6 Comments

Comments are closed for archived issues.