Description
Entire road requires re-surfacing between W.Peachtree & Spring. As a feeder to the I-75N on ramp, it should have been repaved as part of the 14th Street Bridge replacment project.
Reporter
Entire road requires re-surfacing between W.Peachtree & Spring. As a feeder to the I-75N on ramp, it should have been repaved as part of the 14th Street Bridge replacment project.
Comments