Description
Would you be able to add more rocks please to the entire drainage easement at this address? The rocks have settled, I included a picture from 2010 and 2023.
Thank you .
Would you be able to add more rocks please to the entire drainage easement at this address? The rocks have settled, I included a picture from 2010 and 2023.
Thank you .
7 Comments
L1234 (Registered User)
Town of Smithfield (Verified Official)
Closed Charlie W- Public Works Deputy Director (Verified Official)
Reopened Kevin Cleary - Town Engineer (Registered User)
Kevin Cleary - Town Engineer (Registered User)
Good morning.
The Town Engineers Office has inspected the subject drainage ditch for erosion and settlement. It is hard to understand what the request being made is? It is not apparent that erosion has occured or any settlement of the stabilization rip-rap stone has also occured.
The only observation that was made along the entire length of the stone drainage ditch was that vegetation, over the course of time, has partially grown into the stone that is within the ditch.
Kevin Cleary - Town Engineer (Registered User)
Closed Charlie W- Public Works Deputy Director (Verified Official)