City of Canton, OH PLUS
Open Issues: 162
Closed Issues: 48,946
Acknowledged Issues: 1,231
-
Construction Project QuestionAcknowledged44710 Canton, Ohio - CantonWHO DO WE CONTACT ABOUT THE REALLY BAD ATTEMPT TO PUT OUR GRASS BACK AFTER DOMINION PUT OUR NEW GAS LINES IN 1 THEY DIDNT PUT ENOUGH SOIL BACK 2 I HAVE WATERED THIS DAILY AND NO SIGNS OF THEUR SEED COMING UP NOW THE PLACES THAT THEY MISSED AND I PUT SEED ARE COMING UP
-
Public Works Construction ProjectAcknowledgedHarvard Ave Nw & 16th St Nw Canton, Ohio, 44703 - Canton
ADA Compliant Curb Ramp Sidewalk Request
I reported this need on 6/7/2023 - Issue ID: 14668861 and received the following response on 6/13/2023, "An ADA Curb ramp will be installed this summer (2023)".Issue 14668861 was closed same day as response telling me it would be installed Summer 2023. It was never installed. Hoping maybe this summer (2024)?
-
Public Works Construction ProjectAcknowledged1000 Ridge Rd Nw Canton, OH 44703, USA - CantonAfter the recent work was done on the intersection at Ridge Rd and 10th NW, the storm drain grate/guard is missing and is a safety hazard.
-
Lawn needs repairedAcknowledged3003 Coventry Blvd Ne Canton, Ohio, 44705 - CantonLawn tore up by city.
-
Public Works Construction ProjectAcknowledged1428 Rowland Ave Ne Canton OH 44705, United States - CantonSidewalk is not safe to use. Concrete is broken and a terrible tripping hazard. City harms been notified but doesn't repair it. I hope someone doesn't break a leg in the dark!
-
Public Works Construction ProjectAcknowledged2537 Indiana Way Ne Canton, Ohio, 44705 - CantonThe porch was torn off last year and the rodent problem increased
-
Public Works Construction ProjectAcknowledged3016 3rd St Nw Canton, OH 44708, USA - Cantoncanton city water department did work on 3016 3rd st n.w , the way they had to set up cones for the holes they gldug is a accident waiting to happen ..these holes need to be paved a.s.a.p its been over a week now .. on coming traffic is using left lane to get to light while others our turning off wertz onto 3rd it's hard to see traffic in wrong lane until your halfway into your turn .. on comin traffic is also blocking the left lane so people turning into 3rd can't follow thru with thier lane of traffic .. please see to it this gets fixed now before a major accident happens
-
Public Works Construction ProjectAcknowledged1229 Wertz Ave Sw Canton, OH 44710, USA - CantonAll the road work that was done in southwest end by raft road. there's cones everywhere. there's road closed. signs still out and they completed the project a few weeks ago. it looks on professional from the company who did the streets
-
Public Works Construction ProjectAcknowledged171–185 14th St Ne Canton OH 44714, United States - CantonWhen the water department did some work they left a cone where the street was dug up The street is paved now Do you want the cone?
-
Construction Project QuestionAcknowledged1644 Woodland Ave Nw Canton, Ohio, 44703 - CantonVarious types of electrical work, construction work, and new plumbing lines installed. Dumpster on site. No permits.
-
Health HazardAcknowledged1027 16th St Ne Canton, Ohio, 44714 - CantonHOUSE IS DEPLORABLE AND THE CEILING IS CAVING.
-
Roadside Ditch - Request to Enclose with PipeAcknowledged322 15th St Nw Canton OH 44703, United States - CantonAlley way water runs into driveways