Bob Boileau

  • 288 River Road Andover, MA 01810, USA - Andover
    Between Ferry Crossing and Cross Street. Whoever coated the asphalt should have been paid. That is the bumpiest section on River Road. When is the town of Andover going to fix this disgraceful to our town. Please reply.
    Bob Boileau
    978 430-3377 cell
  • 285 River Road Andover, MA 01810, USA - Andover
    Road re pavement between Cross Street and Jullian Way on River Road. When is this scheduled for repaying? It has been pretty rough for a long period of time.
    Bob Boileau
  • Pothole Acknowledged
    Cambridge Street Avenue Boston, MA 02114, USA - Central
    Road pavement between Cross Street an Jullian Way on River Road. It is rough, when is it scheduled to be repaved?
  • 164-166 River Road Andover, MA 01810, USA - Andover
    River road was repaved near I93 some time ago. Driving at night is down right dangerous without line painting of the new black asphalt. Someone is going to have an accident. Please paint the center yellow line and white side lines before it's to late and winter arrives.
  • Pothole Archived
    16 Greybirch Road Andover, MA 01810, USA - Andover
    Like to this finial repaired ASAP!
  • Signs Archived
    8 Greenbriar Cir Andover, MA 01810, USA - Andover
    Sign missing!