Comments

Issue Acknowledged
03-28-2014

We received your issue and will address it as soon as we can. Thanks for reporting.

Issue Acknowledged
03-28-2014

We've received your issue and will inspect it as soon as we can. Thanks for reporting.

Assignment
03-28-2014

Department of Public Works assigned this issue to Road Repave

Issue Closed
03-28-2014

Filled potholes throughout the Orange Street area. Street assigned to "road repave".

Assignment
03-28-2014

Department of Public Works assigned this issue to Road Repave

Issue Closed
03-28-2014

Crews onsite for two days. Road assigned to Repave.

Inspected. Concrete sidewalk in fair condition. Minor repair. Schedule grinding.

Area inspected 3/14. Stamped concrete at tree planters are lifted. Cut and remove

Inspected. Asphalt curb damaged. Removed 3/19/14.

Assignment
03-28-2014

Department of Public Works assigned this issue to Permanent Repair Related To Major Project

Comment
03-28-2014

Concrete sidewalk is broken and scabbed. City trees present. Hot patch needed and area assigned to "Permanent repair related to major project".

Issue Closed
03-28-2014

Area around 160 inspected. No sinkholes in sidewalk or street were found.

Assignment
03-28-2014

Department of Public Works assigned this issue to Permanent Repair Related To Major Project

Inspected. Previous patch has worn. Schedule additional maintenance and assign location to "Permanent repair related to major project"

Concrete sidewalk fair/good condition. Where large tree is @ driveway was previously patched. Schedule additional maintenance and assign for repair - "isolated repair C"

Assignment
03-28-2014

Department of Public Works assigned this issue to Isolated Repair C

Comment
03-28-2014

Concrete sidewalk fair condition. Major lift@ drive where healthy oak is located. Patch and schedule repair.Assigned to Isolated repair C.

Assignment
03-28-2014

Department of Public Works assigned this issue to Road Repave

Issue Closed
03-28-2014

Crews were in area 3/24 & 3/25 patching potholes. Road has been assigned to "road repave" and we will continue to monitor. Thanks for reporting.

Inspected. Concrete sidewalk fair condition. Small area minor lift which needs grinding.
Cracked areas not tree related.