Marta

  • 5-9 Fuller Rd Lexington, MA 02420, USA - Lexington
    Multiple granite slabs and 5 orange pilons have been left on Fuller Road between Harding and Gleason Roads. Three orange pilons are on the middle of the road, it appears that construction/paving contractors forgot to pick them up on Monday (9/11) morning.
    The granite slabs have been sitting on the road for weeks, this also appears to be leftover debris from paving contractors.
  • 9 Fuller Road Lexington, MA 02420, USA - Lexington
    A ground hole has formed next to the water drain located in the corner of Fuller and Gleason Roads. The hole area appears to gradually be getting bigger.