Description
CDOT has plans to fix pothole at transit shelter. No plans to correct intermittent water leak, repair road surface, replace non standard curb and gutter that is failing due to higher traffic volumes, resurface patchwork surface of block, extend bike lanes or correct previously repaired pedestrian crosswalk.
This block will continue to cause real issues for transit vehicles, cars and bikes until the block is repaired as a whole. The block is now classified as a mini transit hub and will continue to have large amounts of traffic without clear designs for same, bikes and pedestrians.
2 Comments
tl lansdell (Guest)
The previously unfinished crosswalk from a previous project, was restriped.
Closed tl lansdell (Guest)