Description
The concrete on this entire span of the bridge that carries Fletcher Dr North over I84 is a pathetic mess and has been for years. The Re-bar is exposed under the concrete in many potholes. Apparently the 2 yr job of painting the bridges is more important than safety. Glad our taxes are going to paint and overtime rather than much needed improvements.
1 Comment
Closed majorben (Registered User)