Various requests to improve area from Alameda County SR2S. These numbers correspond to a pdf.
1a. Grand St. Restripe bike lanes
1b. Grand St. Request to stripe bike buffer
4. Grand St. Trim overgrown vegetation in median.
5. Grand St, midblock crossing. Install RRFB and yield markings
6a. Grand/Otis. Install high visibility crosswalks and stop bars.
6b. Grand/Otis. Install lead pedestrian interval.
7. Grand/Sandcreek. Replace in-roadway lights with RRFB, install curb extensions, install median refuge.
8. Grand/Shore Line. Install signage, advanced stop bar, and 2-stage turn box.
4 Comments
City of Alameda (Verified Official)
Acknowledged Public Works Transportation Alan (Verified Official)
Requests for many transportation issues, including stop signs, curb painting, and traffic calming measures, typically require 8-12 weeks to complete before staff can develop a recommendation. These requests involve review of current plans and policies, compilation of accident and/or other history, coordinating with Alameda Police and other stakeholders, outreach to residents or others who may be affected by the proposed change, on-site data collection and analysis, and sometimes consultation with outside experts.
I will follow up with you about your request when your request is at the top of the queue. Unfortunately, due to limited funding, there is a backlog of these requests and they are being handled in the order of receipt. Due to that backlog, some requests may take six months to a year to complete the analysis and recommendation.
Thank you for your patience and understanding.
medm (Registered User)
Closed PW Director (Verified Official)