This is a well used road and because it is still a dirt road seems to be in rough shape with pot holes and washboard. I was wondering if there was a plan to pave this stretch of road.
The only portion of 92 Street within City limits that is not currently paved is north of 132 Avenue. There are currently no plans to pave this stretch of road.
6 Comments
City of Grande Prairie (Registered User)
Robin_ContactCentre (Registered User)
Engineering Staff (Registered User)
Sean (Registered User)
Acknowledged Engineering Staff (Registered User)
Closed Engineering Staff (Registered User)