The Department of Public Works has received this issue and will forward it to our Highway Division for investigation. Thank you for bringing this issue to our attention.
The Town implemented a Town wide sidewalk inventory and condition survey study in the fall of 2015. The sidewalk study should be completed by the consultant by November, 2016. The Town will review the data and draft a priority sidewalk reconstruction plan and submit a request for funding. Sink holes and tripping hazards will be patched by the DPW.
The Town implemented a sidewalk inventory and condition survey during the fall of 2015. The
sidewalk study should be completed by December, 2016 at which time the Town will review a draft priority list and seek funding.
7 Comments
Needham DPW (Verified Official)
Highway Assistant Superintendent (Verified Official)
Acknowledged Highway Assistant Superintendent (Verified Official)
Highway Assistant Superintendent (Verified Official)
Highway Superintendent (Verified Official)
Closed Highway Superintendent (Verified Official)
sidewalk study should be completed by December, 2016 at which time the Town will review a draft priority list and seek funding.
Looking Around (Registered User)