Description
The construction site at 222 First Street, between Grove and Erie, already blocks half of the sidewalk with a chain link fence.
Now they've left the other half a slushy mess, which will only get more treacherous as temperatures drop.
Reporter
The construction site at 222 First Street, between Grove and Erie, already blocks half of the sidewalk with a chain link fence.
Now they've left the other half a slushy mess, which will only get more treacherous as temperatures drop.
2 Comments
Jessica (Registered User)
Closed 9InchNail (Registered User)