Description
The temporary patch / asphalt work runs the entire width of the northbound bike lane on 14th st and is over 1 block in length, between S st and T st. The repair is entirely un-level with the street which has resulted in a large section of bike lane being unsuitable to ride a bike. Bikers are forced to ride in the street, causing increased risk for drivers and safety concerns for bikers.
2 Comments
Acknowledged DC 311 (Registered User)
Closed DC 311 (Registered User)
Comments update: 14-00306398-Street Repair
1833 14th St NW , Washington, District of Columbia
The temporary patch / asphalt work runs the entire width of the northbound bike lane on 14th st and is over 1 block in length, between S st and T st. The repai
By DOGGETT, QUARTNEY R: 1/8/2015 9:13:30 AM
Raymond McLeod, states that this is a Washington Gas (WGL) issue in the 1800 block of 14th Street, NW. This project is permitted (PA80711-R6). WGL has been notified to bring temporary repairs to grade. This location is being monitored.
By HALL, JENNIFER: 3/28/2015 11:07:21 AM
Utility Issue: WGAS. A temporary repair has been made. Permanent restoration is forthcoming. Location being monitored. Ticket closed.