This is an unaffiliated request

Q&A requested from Mr. Blume with Mayoral Oversight regarding Waste Treatment Concept Archived

1 City Hall Ansonia, CT Show on Map Hide Map
Move the marker to represent your issue's location. The address will not change.

Reporter

(Guest)

Issue ID:

132324

Submitted To:

Community

Category:

None

Viewed:

2323 times

Neighborhood:

Ansonia

Reported:

on

Description

Studying the waste capacities closer and pre determining future population strains from both Derby & Ansonia on the pending Ansonia treatment system raises two beneficial questions.
1) How does one document limitations as an agreement with Ansonia & Derby knowing the designed system has a max capacity and DEP compliance usage? The preceding question concerns a possible moratorium on develops & increased populations in both municipalities where both WPCA boards monitor development activity as to not strain the modern system.
2) Will both municipalities be allowed to benefit from the pending ENERGY ASSETS derived from the Greenpoint Energy waste sludge system designed into the waste system infrastructure? This becomes an attractive pitch from Ansonia’s concept to deploy this joint operation dealing with multiple municipality use.
These are critical terms to keep RED flags from rising causing a Sh*t flinging contests between two municipalities.
WARNING- Tabled personal and public benefit agendas from both municipalities need to be aligned and be presented wide open from the very start of the concept.


1 Comment

Comments are closed for archived issues.