Description
Construction barrells placed in roadway for shoulder repair has created a potential for head on collisions.
These barrells have been in place for at least 2 months for roadway failure due to the flood of May 2010.
The concern being the barrells are sitting on a semi-blind curve creating roadway constriction.
The foliage growing has not been cut back creating an even more dangerous situation.
2-22-1012 Barrels were removed from repair area. Roadway unrepaired as of this date. Exposed, pressurized waste line exposed, and unsupported. Potential Bio- mess here seems to be ignored by Public Works. New very small warning "Sticks" were placed in area. No signs of repair crews. Poor service from Public Works !
5 Comments
Joe Brock (Guest)
Public Works (Guest)
Request 310873 & 310875- have been sent to our compliance inspector for investigation.
Thank you,
Metro Public Works
615-862-8750
Anthony Fox (Guest)
Susan Fox (Guest)
The foliage was cut back and the barrels put upright after our first report.
The road has not been repaired and if this is closed I believe it will go back to the way it was. I wish they would do the repairs since it has been about 6 months since the barrels were put there.
Closed susan fox (Guest)