Thank you for expressing your concern. The builder was prepared for a concrete pour, set up for today, for sidewalk and driveway. We had a heavy rain event last night (between 2 and 3 inches of rain in a 30 minute period) that was not expected. I spoke with the builder this morning and he was in the process of cleaning up the dirt that washed onto the street. He also indicated that he had come to the site yesterday following the rain and had cleaned up much of the dirt at that time.
I will take a look at the sidewalk and be sure it is cleaned too. You did not specify a particular area, but I assume I will recognize a muddy sidewalk.
5 Comments
Newnan, Georgia (Registered User)
Closed City Engineer (Registered User)
Reopened rwhatzo (Registered User)
Closed City Engineer (Registered User)
rwhatzo (Registered User)