Description
The ravine parallel to the SW Bikeway was repaired in March of 2009. Ugly gravel roads and riprap were installed. This area badly need landscaping and plantings.
The ravine parallel to the SW Bikeway was repaired in March of 2009. Ugly gravel roads and riprap were installed. This area badly need landscaping and plantings.
1 Comment
Closed Display Name Blocked (904) (Registered User)