Sorry for the length of time it took for us to respond to this! Some issues in the SCF system were lost and are just now being recovered. This is actually a pipe that was purposefully installed in the pavement to drain an underground rivulet properly to the surface.
Wish I had better information for you, but this solution was approved by the design engineer as the best option for dealing with this subsurface issue. It was reviewed and approved by our engineering staff. If you'd like more specific information on this, please contact Paul Kallam paul.kallam@raleighnc.gov
5 Comments
Acknowledged City of Raleigh 3 (Verified Official)
Closed City of Raleigh 3 (Verified Official)
Reopened Arcododger (Registered User)
Arcododger (Registered User)
Closed City of Raleigh 3 (Verified Official)